Marco de Referencia para la Formulación de un Plan de Continuidad de Negocio para TI, un caso de estudio
Marco de Referencia para la Formulación de un Plan de Continuidad de Negocio para TI, un caso de estudio
How to Cite
Download Citation
Show authors biography
Similar Articles
- Carlos Molina, Vladimir Bonilla, Application of CRISP-DM Methodology in the Analysis of Dissolved Gases in Dielectric oil of Electrical Transformers in the Ecuadorian Electrical Sector , Revista Técnica "energía": Vol. 21 No. 1 (2024): Revista Técnica "energía", Edición No. 21, ISSUE I
- Edison Novoa, Gabriel Salazar Yépez, Eliana Buitrón, Gabriel Salazar Pérez, Methodological Proposal for Targeting Electric Subsidy "Tarifa De La Dignidad" in Residential Users of the Electric Companies of Ecuador , Revista Técnica "energía": Vol. 20 No. 1 (2023): Revista Técnica "energía", Edición No. 20, ISSUE I
- Diego Lojano, Juan Palacios, Optimal Power Flow in Electrical Power Systems with Environmental Considerations , Revista Técnica "energía": Vol. 21 No. 2 (2025): Revista Técnica "energía", Edición No. 21, ISSUE II
- José Castro, Paúl Soto, Ruth Reategui, Tuesman Castillo, Partitioning of an Electrical Distribution Systems Using K-Means and DBSCAN Clustering Algorithms , Revista Técnica "energía": Vol. 20 No. 1 (2023): Revista Técnica "energía", Edición No. 20, ISSUE I
- Kleber Zhañay, Cristian Leiva, Erika Pilataxi, William Quitiaquez, Wear - Sediment Quantity Correlation Model for Preventive Maintenance Scheduling of a Hydroelectric Power Plant , Revista Técnica "energía": Vol. 21 No. 2 (2025): Revista Técnica "energía", Edición No. 21, ISSUE II
- Julio Cardenas, Graciela Colomé, Estefania Tapia, Adaptive Generator Tripping to Improve Transient Stability in Systems with Renewable Generation Integration , Revista Técnica "energía": Vol. 22 No. 2 (2026): Revista Técnica "energía", Edición No. 22 ISSUE II
- Joffre Constante, Augusto Riofrío, Aharon De La Torre, Jaime Cepeda, Methodology for Steady-State and Dynamic Modelling of S.N.I in HYPERsim, Application in the Electromagnetic Transient Analysis for 500 kV Systems , Revista Técnica "energía": Vol. 16 No. 2 (2020): Revista Técnica "energía", Edición No. 16
- Cristian Cuji, Jonathan Villarreal, Design and Evaluation of a Standalone Photovoltaic System for Rural Road Lighting and Electric Vehicle Charging Based on a Multipurpose Approach , Revista Técnica "energía": Vol. 20 No. 2 (2024): Revista Técnica "energía", Edición No. 20, ISSUE II
- Wilson Brito, Wilson Sánchez, Performance Evaluation of LSTM and XGBoost Models for Electric Demand Forecasting in the Ecuadorian Power System , Revista Técnica "energía": Vol. 22 No. 2 (2026): Revista Técnica "energía", Edición No. 22 ISSUE II
- Joffre Constante, Lesly Ochoa, Brayan Caiza, Walter Rueda, Omar Chuquitarco, Parametric Identification of the Oscillatory Component Load Model Using Synchrophasor Measurements and Optimization Techniques , Revista Técnica "energía": Vol. 22 No. 2 (2026): Revista Técnica "energía", Edición No. 22 ISSUE II
You may also start an advanced similarity search for this article.
The purpose of the Business Continuity Plan (BCP) is to provide procedures to maintain the operation of an organization’s critical services in the event of an interruption, while recovery work is still in process, such as in the event of a natural disaster or human error.
There is currently a BCP/DRP initiative which has been classified as high priority by the majority of organizations, as it is a necessary strategy that could become the defining element between remaining on the market, or from disappearing from the market.
The practice has shown that there are situations in which an apparently “simple” hardware maintenance procedure could leave an organization without its main work tool, causing problems for its internal/external users, disciplinary/regulatory fines, damage to reputation and depending on the seriousness of the issues, even the laying off of its representatives with legal consequences for damage claims – all due to a lack of proper processes, procedures and instructions which identify the actions to be taken before and after a disaster scenario.
This study attempts to propose a framework that would allow organizations to formulate a Business Continuity Plan for TI or a Disaster Recovery Plan, through the application of clear and essential principles expressed in everyday language.
To conclude, the proposed framework will be applied to the study case – the DRP of the CENACE’s SIMEC Commercial Measurement System.
Article visits 3047 | PDF visits 2223















