Marco de Referencia para la Formulación de un Plan de Continuidad de Negocio para TI, un caso de estudio
Marco de Referencia para la Formulación de un Plan de Continuidad de Negocio para TI, un caso de estudio
How to Cite
Download Citation
Show authors biography
Similar Articles
- William Yugcha, Diego Pichoasamin, Paúl Astudillo, Comparison and Optimization of the Use of Passive and Active Power Filters to Mitigate Harmonics in Distribution Networks with non-linear loads , Revista Técnica "energía": Vol. 21 No. 1 (2024): Revista Técnica "energía", Edición No. 21, ISSUE I
- Jorge Leon, Graciela Colomé, Estefanía Tapia, Identification of Critical Generators in Transient Stability Problems , Revista Técnica "energía": Vol. 21 No. 2 (2025): Revista Técnica "energía", Edición No. 21, ISSUE II
- Armando Freire, Fernando Arias, Héctor Mullo, Jhonny Casa, Implementation of Remote Control for the Opening and Closing of Reactive Compensation to the 13,8 kV Feeder of the Electrical Substation of Novacero S.A. by means of an ADVC-IOEX Card , Revista Técnica "energía": Vol. 21 No. 1 (2024): Revista Técnica "energía", Edición No. 21, ISSUE I
- Nelson Granda, Karen Paguanquiza, System Frequency Response Models for the Ecuadorian Interconnected Power System , Revista Técnica "energía": Vol. 21 No. 1 (2024): Revista Técnica "energía", Edición No. 21, ISSUE I
- Gabriel Guañuna, Santiago Chamba, Nelson Granda, Jaime Cepeda, Diego Echeverría, Walter Vargas, Voltage Stability Margin Estimation Using Machine Learning Tools , Revista Técnica "energía": Vol. 20 No. 1 (2023): Revista Técnica "energía", Edición No. 20, ISSUE I
- Marcio Zamboti, Ana Becker, Alan Pombo, Carlos Henriques, Eduardo Sousa, Rafael Soares, Angelo, Experimental Evaluation of the Photometric Performance of LED Luminaires for Public Lighting under Accelerated Aging , Revista Técnica "energía": Vol. 22 No. 2 (2026): Revista Técnica "energía", Edición No. 22 ISSUE II
- Isaac Simbaña, Sarai Mena, Silvana Chasipanta, EEnergy Efficiency Analysis of an Electric Furnace through the Implementation of a Forced Convection Fan , Revista Técnica "energía": Vol. 22 No. 1 (2025): Revista Técnica "energía", Edición No. 22, ISSUE I
- Alan Cuenca, Cristina Oña, Ismael Suquillo, Henry Miniguano, Design Methodology of Off-Grid PV Solar Powered Systems for Rural Areas in Ecuador , Revista Técnica "energía": Vol. 20 No. 1 (2023): Revista Técnica "energía", Edición No. 20, ISSUE I
- Diego Paguay, Ricardo Lozada, Ariel Almeida, Carlos Lozada, Implementation of a Phasor Measurement Unit PMU Model in the Real Time Simulation Software for Electromagnetic Transients HYPERSIM , Revista Técnica "energía": Vol. 22 No. 2 (2026): Revista Técnica "energía", Edición No. 22 ISSUE II
- Selene Peñafiel, Patricia Otero, Fabián Pérez, Diagnosis of the State of Distribution Transformers Through the Frequency Response Analysis Test , Revista Técnica "energía": Vol. 20 No. 1 (2023): Revista Técnica "energía", Edición No. 20, ISSUE I
You may also start an advanced similarity search for this article.
The purpose of the Business Continuity Plan (BCP) is to provide procedures to maintain the operation of an organization’s critical services in the event of an interruption, while recovery work is still in process, such as in the event of a natural disaster or human error.
There is currently a BCP/DRP initiative which has been classified as high priority by the majority of organizations, as it is a necessary strategy that could become the defining element between remaining on the market, or from disappearing from the market.
The practice has shown that there are situations in which an apparently “simple” hardware maintenance procedure could leave an organization without its main work tool, causing problems for its internal/external users, disciplinary/regulatory fines, damage to reputation and depending on the seriousness of the issues, even the laying off of its representatives with legal consequences for damage claims – all due to a lack of proper processes, procedures and instructions which identify the actions to be taken before and after a disaster scenario.
This study attempts to propose a framework that would allow organizations to formulate a Business Continuity Plan for TI or a Disaster Recovery Plan, through the application of clear and essential principles expressed in everyday language.
To conclude, the proposed framework will be applied to the study case – the DRP of the CENACE’s SIMEC Commercial Measurement System.
Article visits 3622 | PDF visits 2362