Skip to main navigation menu Skip to main content Skip to site footer

Quality control and assurance plan for the recovery of a Francis turbine runner from a hydroelectric power plant

Plan de control y aseguramiento de la calidad para la recuperación de un rodete de turbina Francis de una central hidroeléctrica




Section
TECNOLÓGICOS E INNOVACIÓN

How to Cite
Quality control and assurance plan for the recovery of a Francis turbine runner from a hydroelectric power plant. (2019). Revista Técnica "energía", 15(2), PP. 57-65. https://doi.org/10.37116/revistaenergia.v15.n2.2019.377

Dimensions
PlumX

How to Cite

Quality control and assurance plan for the recovery of a Francis turbine runner from a hydroelectric power plant. (2019). Revista Técnica "energía", 15(2), PP. 57-65. https://doi.org/10.37116/revistaenergia.v15.n2.2019.377

Download Citation


Similar Articles

1-10 of 486

You may also start an advanced similarity search for this article.

The purpose of this paper is to establish the procedure for the inspection and execution of tests to control and assurance of quality, during the recovery process of the Francis runners, which are elements used as a fundamental part in hydraulic turbines for the generation of electric power. The recovery is based on executing the dimensional control over runner geometry, the material characterization, the metallographic analysis and non-destructive tests (NDT) on welds based on the guidelines of the specification for hydraulic machines CCH 70-4; to determine the zones of wear affected by phenomena such as: cavitation, corrosion and erosion; as well as areas damaged by failure mechanisms as a result of efforts to design, loads and operating factors of the machines. In addition, this creates a reference in terms of technical and technological capabilities in the country, which is projected at the regional level to provide services and specialized engineering solutions, achieving to break the dependence of big foreign companies, creating an added value with the transfer of knowledge; obtaining in this way a substantial saving in costs and time in the process of runner’s recovery.


Article visits 2127 | PDF visits 1155


Downloads

Download data is not yet available.
Sistema OJS 3.4.0.9