Análisis de la Energización de la Línea Eléctrica Enterrada de 69 kV entre CPF (Bloque 15) y Sacha (Bloque 60) en el Sistema Eléctrico Interconectado Petrolero - Extendido

Main Article Content

R. Cela
M. Chamba
R. Sanguil
M. Solís

Abstract

According to the National Government policy’s related to the Energy Matrix Revolution; PETROAMAZONAS EP is developing the Program called as “Optimización Generación Eléctrica y Efi ciencia Energética” (OGE&EE Program). The mission of the OGE&EE Program is change the Energy Matrix of Ecuadorian Oil Industry through the design and implementation of Gas gathering and transportation systems, Power Generation, Transmission and Distribution Systems. In this context, Petroamazonas EP has built the fi rst underground transmission line of 40 km. and 69 KV between CPF (Petroleum block 15) and Sacha (Petroleum block 60), which by its voltage level and length has important technical challenges that must be overcome. With this background, the objective of this article is to broadcast the results of the electric studies and the experience in the energization and operation of the underground transmission line CPF - Sacha 69 KV.

Downloads

Download data is not yet available.

Article Details

How to Cite
Cela, R. ., Chamba , M. ., Sanguil , R., & Solís , M. . (2016). Análisis de la Energización de la Línea Eléctrica Enterrada de 69 kV entre CPF (Bloque 15) y Sacha (Bloque 60) en el Sistema Eléctrico Interconectado Petrolero - Extendido. Revista Técnica "energía", 12(1), PP. 47–55. https://doi.org/10.37116/revistaenergia.v12.n1.2016.26
Section
SISTEMAS ELÉCTRICOS DE POTENCIA

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.