Experiencias de la Operación del AGC del Sistema Eléctrico Ecuatoriano con las Centrales Pucará, Mazar y Marcel Laniado

Main Article Content

A. Narváez

Abstract

The purpose of this article is to analyze the technical feasibility for the CENACE Automatic Generation Control operation through the power plants called: Pucará, Mazar and Marcel Laniado.


Additionally, it is described the data acquisition process for the signals used in these power plants integration to the Secondary Frequency Regulation.

Downloads

Download data is not yet available.

Article Details

How to Cite
Narváez , A. . (2016). Experiencias de la Operación del AGC del Sistema Eléctrico Ecuatoriano con las Centrales Pucará, Mazar y Marcel Laniado. Revista Técnica "energía", 12(1), PP. 132–137. https://doi.org/10.37116/revistaenergia.v12.n1.2016.35
Section
SISTEMAS ELÉCTRICOS DE POTENCIA

Similar Articles

1 2 3 4 > >> 

You may also start an advanced similarity search for this article.